Steam Generator Rough-in
As the steam room is being built, installation of copper piping, steam line pipes, and cable channels can be installed to make it easier for everyone involved. It’s a good idea to run the control cable during the rough-in stage and have the tile professional work around it. In the images following the orange cable is the control cable. Try to avoid having to cut the hole and run the cable after all the tile work has been completed.
Image Gallery